02
What we back
Intelligence is an industrial product. It is made in halls, from electricity, and it needs the same things a smelter needed a century ago: cheap clean power, cold air, and someone willing to hold the asset for decades.
Unit AAI compute
GPU and accelerator capacity built for training and inference, operated for enterprises and public bodies that need their models to run on Nordic soil, under Nordic law.
- Role
- Anchor capital
- Horizon
- 10 years and beyond
- Stage
- Build-out to operation
Unit BData centres
Sites where the land, the grid connection and the cooling are already resolved. We back developers and operators who treat a hall as a forty-year building, not a lease.
- Role
- Holding partner
- Horizon
- Through the full asset life
- Stage
- Permitted land to live hall
Unit CPower and connectivity
Hydro offtake, grid capacity and the fibre that ties a Nordic hall to Frankfurt, Amsterdam and London. Without these the first two units are just steel.
- Role
- Co-investor
- Horizon
- Contract length
- Stage
- Development and operation